Learning Objective 04-P1: Allocate overhead costs using the plantwide overhead rate method.
The plantwide overhead rate equals total budgeted overhead divided by budgeted plant volume, the latter often measured in direct labor hours or machine hours. This rate multiplied by the number of direct labor hours (or machine hours) required for each product provides the overhead assigned to each product.
Knowledge Check 01
Select from the three alternative methods of overhead allocation in the drop down list so that it matches with the provided feature.
Knowledge Check 01
When using the plantwide overhead rate method, the cost object is
multiple choice
unit of product Correct
direct labor hours
machine hours
the activity
Answer
unit of product
Explanation
Knowledge Check 01
The plantwide overhead rate method uses one overhead rate to allocate overhead costs to products and the target of the cost assignment, or cost object, is the unit of product.
Thanks
No comments:
Post a Comment